How to Add or Remove Craft Groups and Scopes Across a Whole Stream

Stream-wide Add / Remove (craft groups and scopes)

When a whole stream needs the same craft or scope change — for example adding Senior Registrar to every OR group, or removing a scope from all shifts — use the stream-header pencil on Vacancy Planning. This updates requirements only; it does not replace every slot from scratch like the shift-pattern row edit does.

Where to find it

  1. Go to Sidebar → Vacancy Planning (/staffing-vacancies)
  2. Expand the stream you want to change
  3. Hover the stream name row (the grey header above its shift patterns)
  4. Click the purple layers icon that appears — tooltip: Add or remove craft groups & scopes across all patterns in [stream] (from this week forward)

The modal title reads Edit [Stream Name] — All Future Weeks.

What you can change

  • Add or Remove (one operation per apply)
  • Select one or more craft groups and/or one or more scopes of practice
  • Changes apply to every requirement in that stream, for every shift pattern, from the Monday of the week you are viewing onward
  • Past weeks are not changed

What stays the same

  • Staff counts (requiredCount) on each slot are preserved
  • Craft groups and scopes you do not select are left untouched
  • Staff already assigned to those shifts are never unassigned by this tool

How OR groups behave

SituationWhat happens
Add a craft to a single-craft slotThe slot becomes an OR group (existing craft + new craft)
Add a craft already in the OR groupNo change for that row (already present)
Remove one craft from an OR groupThe other options stay; if only one craft remains, the row collapses back to single-craft
Remove the only craft on a slotThat row is skipped — you cannot leave a requirement with zero craft groups. The review step reports how many were skipped

Scope changes follow the same add/remove logic on the requirement's mandatory scope list.

Step by step

  1. Open the stream pencil modal
  2. Choose Add or Remove
  3. Tick the craft groups and/or scopes you want to change (Remove only lists crafts/scopes currently used in the stream)
  4. Click Next: Review — the preview shows affected weeks, dates, requirements changed, and any skipped rows
  5. Type APPLY ALL to confirm
  6. Click Add across all future weeks or Remove across all future weeks

After you apply — check roster quality

Changing requirements does not automatically move people off shifts. If an assigned person's craft group or scope no longer matches the updated requirement:

  • The mismatch appears in The Living Roster → Roster Health under Craft Group Mismatches or Scope of Practice Mismatches
  • Use the Resolve tab in Roster Health to review and remove unsafe assignments, then Fill Gaps or manually restaff
  • For batch IRIS suggestions, open Resolution Plan Builder from Roster Health's Resolve flow (or the conflict-resolution action on The Living Roster when conflicts are present)

Already-published open shifts for affected dates are resynced to match the new Level 2 requirements where possible.

Stream edit vs shift-pattern row edit

ActionOpensEffect
Stream header layers icon (purple)Add / Remove modalAdds or removes crafts/scopes on existing requirements; counts preserved
Shift-pattern row (blue pencil on hover)Vacancy modal — Edit [Pattern] — All Future WeeksReplaces all requirements on that pattern from this week forward (destructive overwrite)
Single cell clickVacancy modal — day editorEdit one or more days on that pattern only

Use the purple layers icon on the stream header when you want to tweak who can fill slots across the whole stream. Click a shift-pattern row (blue pencil) only when you need to redefine the full requirement set for one shift pattern.